THIS BOND WILL ADDRESS THESE PRIORITIES:
Intermediate Campus
New PE Building w/ connection to Main Building
Does not contain storm shelter
New accessible routes to playground structures
New electrical and lighting throughout 100 and 200 Classroom Wings
New water heater replacements
New security fencing and gates in front of cafeteria
Misc. Additional Costs
Architectural & Engineering Fees
Civil Engineering
Topographic Survey
Geo Tech Engineering & Soils Testing
Materials Testing (Soil/Fill Compaction, Roofing, Concrete)
Furniture & Fixtures
Kitchen Equipment
Bond Issuance Costs & Legal Fees
ADA Inspections & Certification
Building Permits & Inspections
Total Price: $88,350,000
New High School
New 3-story, 128,000 SF High School Building
New secure staff parking lot on south side of site
New student / visitor parking lot on west side of Arwine Gym
New parent pick-up / drop off lanes off of N. Texas Street
New Visitor Parking on east side of Fine Arts Building
New covered canopy on N. side of building connecting bus pick-up / drop-off to new building
New practice field – sod, not artificial turf
New drive on N. side of stadium that provides access between Junior High and High School
Phased demolition of the following buildings
Main High School Building
English Wing
Old Gym
Cafeteria
300 Building
400 Building
New perimeter security fencing and gates around perimeter of buildings
Junior High Campus
New Freestanding Cafeteria Building
New 16 Classroom Addition
Includes 2 new student restrooms
Main Building Renovation
3 new classrooms
1 new Life Skills unit
2 New Student Restrooms
1 New Teachers Lounge and Restroom
Remodel of 2 existing student restrooms
Membrane roofing replacement on Main Building
New Fire Alarm / Intercom System throughout all buildings
New drive and staff parking on east side of building
Relocation of existing football practice field – sod, not artificial turf
Grading and drainage infrastructure improvements at Main Building and Old Gym