THIS BOND WILL ADDRESS THESE PRIORITIES:

Intermediate Campus

  • New PE Building w/ connection to Main Building

    • Does not contain storm shelter

  • New accessible routes to playground structures

  • New electrical and lighting throughout 100 and 200 Classroom Wings

  • New water heater replacements

  • New security fencing and gates in front of cafeteria

Misc. Additional Costs

  • Architectural & Engineering Fees

  • Civil Engineering

  • Topographic Survey

  • Geo Tech Engineering & Soils Testing

  • Materials Testing (Soil/Fill Compaction, Roofing, Concrete)

  • Furniture & Fixtures

  • Kitchen Equipment

  • Bond Issuance Costs & Legal Fees

  • ADA Inspections & Certification

  • Building Permits & Inspections

Total Price:  $88,350,000

 New High School

  • New 3-story, 128,000 SF High School Building

    • New secure staff parking lot on south side of site

    • New student / visitor parking lot on west side of Arwine Gym

    • New parent pick-up / drop off lanes off of N. Texas Street

    • New Visitor Parking on east side of Fine Arts Building

    • New covered canopy on N. side of building connecting bus pick-up / drop-off to new building

    • New practice field – sod, not artificial turf

    • New drive on N. side of stadium that provides access between Junior High and High School

  • Phased demolition of the following buildings

    • Main High School Building

    • English Wing

    • Old Gym

    • Cafeteria

    • 300 Building

    • 400 Building

  • New perimeter security fencing and gates around perimeter of buildings

 Junior High Campus

  • New Freestanding Cafeteria Building

  • New 16 Classroom Addition

    • Includes 2 new student restrooms

  • Main Building Renovation

    • 3 new classrooms

    • 1 new Life Skills unit

    • 2 New Student Restrooms

    • 1 New Teachers Lounge and Restroom

    • Remodel of 2 existing student restrooms

  • Membrane roofing replacement on Main Building

  • New Fire Alarm / Intercom System throughout all buildings

  • New drive and staff parking on east side of building

  • Relocation of existing football practice field – sod, not artificial turf

  • Grading and drainage infrastructure improvements at Main Building and Old Gym 

Join the Conversation…